Put in your own figures and you get two answers: what your network leaves each month once
electricity, fees and the site owner's cut are paid, and how long it takes to earn back what
the installation cost you.
The maths is the same the platform runs on real charging sessions, not rounded brochure
numbers: you can check the fee breakdown before
trusting any of it.
Per month
| Sessions | — |
| Energy delivered | — |
| Gross revenue | — |
| Electricity | — |
| Gateway fee (2% + EUR 0.25/session) | — |
| askacharge.com software | — |
| Site owner's share | — |
| You keep | — |
| Per year | — |
| Per session | — |
On these figures the network leaves no margin, so it never pays back. Raise occupancy or the
selling price, or bring the electricity cost down, and look again.
And on another platform?
What the software would cost you per month with these same numbers, on the platforms that publish their price. Without electricity or the site owner's share, which are the same everywhere.
Prices published by each platform on its website, checked in October 2026 (comparison, with sources). Platforms that don't publish a price (AMPECO, Virta, ChargePoint, Driivz…) are left out: no guessing here. If you spot an outdated price, write to info@askacharge.com.
What this calculator does NOT cover. It is an estimate, and it is worth
knowing where it falls short:
- It assumes the same occupancy every month. In real life a hotel charger in August and in
February are not the same business.
- It excludes maintenance and faults, and faults happen. The platform does record them, and
there the payback date moves on its own when a cost appears.
- The electricity price is fixed here. If you buy at market rates, the real cost moves
every hour.
- It ignores standing capacity charges, civil works beyond what you enter as investment,
and taxes. All figures exclude VAT.
Questions that always come up
- Where do the fees come from?
- The software is EUR 20 a month per brand, unlimited chargers, 0% per
session. The only percentage is card payment: 2% + EUR 0.25 per session, Stripe
already included. Charge by RFID or invoice a fleet monthly and that fee disappears —
switch the selector and watch it go.
- On revenue or on margin?
- This is the clause in a site agreement that moves the most money. 20% of gross revenue
and 20% of margin after electricity are not the same thing, and the gap widens as power
prices rise. Switch it above and compare before you sign.
- What about DC fast charging?
- The maths holds, the numbers change: investment per socket goes up (a 60 kW DC unit
rarely lands under EUR 25,000 installed), kWh per session goes up, and the selling price
usually does too. Occupancy still outweighs everything else.
- Is this what I will see in the platform?
- Same calculation, with one important difference: in the panel nothing is estimated. Every
session carries its real energy, price and cost, and the payback module gives you the date
the balance actually crossed zero — not a projection.
No card to start. Prices exclude VAT.